Planning process and environmental impact assessment
EIA thematic report was approved by the Environmental Board
19.07.2012, the Environmental Board approved Environmental Impact Assessment (EIA) report, which was conducted by E-Konsult.
Download the approval of the Environmental Board here.
Download EIA thematic report, which wasconducted by E-Konsult here.
Downoad main drawing of the thematic plan (author: Sweco AS) here
Download pre-project of the LNG terminal (author: Sweco AS) here
Download thematic plan of the LNG terminal (author: Sweco AS) here